济南富强门业有限公司网站 在线留言 联系我们

服务咨询热线

151 6888 2846

热门关键词: 水晶折叠门 水晶卷帘门 抗风卷帘门

公司新闻

首页>>新闻资讯>>公司新闻济南卷帘门如何布线设置?
联系我们
济南富强门业有限公司

联系人:林经理

电话:151 6888 2846

邮箱:527800164@qq.com

地址:济南市历下区化纤厂路8号3号楼101号

济南卷帘门如何布线设置?

来源:http://www.jnzxmy.com 日期:2020-05-21 发布人:
  近年来,随着社会的进步,电动卷帘门现在广泛使用,广泛用于工厂、社区和其他地方,在当前生活随处可见,卷帘门的线路是如何设置,和门行业来理解它。
  In recent years, with the progress of society, electric roller shutter is now widely used, widely used in factories, communities and other places. It can be seen everywhere in the current life. How to set the circuit of roller shutter, and the door industry to understand it.
  一、如何安排卷帘门的接线
  1、 How to arrange the connection of rolling shutter door
  1、如果您选择只需要遥控,那么只需让电工在窗帘箱或窗帘安装面附近留下一个电位差并安装插座,但要注意这个电位差要求的箱子是“86型”的。
济南卷帘门
  1. If you choose to only use remote control, you only need to let the electrician leave a potential difference near the curtain box or curtain installation surface and install the socket, but note that the box required by the potential difference is "86 type".
  2、如果你选择既有遥控器又有手动控制面板,那就让电工在墙上开一个电位器,注意使用底箱的位置并引线一根三芯导线(单轨一根,双轨需要两根)。每个电动卷帘门轨道电机必须连接到一根三芯导线上,二轨电机零线不能共用。
  2. If you choose to have both remote control and manual control panel, ask the electrician to open a potentiometer on the wall, pay attention to the position of the bottom box and lead a three-core wire (one for single track and two for double track). Each track motor of electric rolling shutter door must be connected to a three core conductor, and the zero line of two track motor cannot be shared.
  如何给电动卷帘门装电线?
  How to wire the electric roller shutter?
  二、如何连接卷帘门电机控制线
  2、 How to connect the roller shutter motor control line
  1. 在需要安装的门框开口处画一条线。指出尺寸,然后让工作人员设计一个合适的电动门。这里重要的一点是,框架内的高度比门的高度稍高一些。
  1. Draw a line at the opening of the door frame to be installed. Point out the size, then let the staff design a suitable electric door. The important point here is that the height of the frame is slightly higher than the height of the door.
  2、先将百叶门框固定,在这里将门框下部的固定板取下;孔两侧地面预留沟槽,经校准合格后,将木楔、门框铁脚及预埋铁板固定焊接牢固。水泥砂浆或强度不小于10MPa的细石混凝土嵌塞能牢固。
  2. Fix the shutter door frame first, and take down the fixing plate at the lower part of the door frame here; reserve grooves on the ground at both sides of the hole, and fix and weld the wooden wedge, the iron foot of the door frame and the embedded iron plate firmly after the calibration is qualified. Cement mortar or fine aggregate concrete with strength not less than 10MPa can be firmly embedded.
  3.安装电动门的主扇。一定要确保卷帘门与墙体形成一个整体,封闭性要做好,然后油漆孔和墙面。抹灰完成后,门缝应平整平整,打开卷帘门应自由移动,不得有过紧、过松和回弹现象。
  3. Install the main fan of the electric door. Make sure that the rolling shutter door and the wall form a whole, and the sealing shall be done well, and then paint holes and walls. After plastering, the door joint shall be flat and flat, and the rolling shutter door shall move freely without over tightening, over loosening and rebound.
  以上是济南卷帘门公司关于电动卷帘门行业如何设置配线的一些介绍,但需要提醒的是,以上预留的位置是为了保证随时可以通电,如果您对我们的产品感兴趣,您可以打电话联系我们。
  The above is the introduction of Jinan roller shutter company on how to set up wiring in the electric roller shutter industry, but it should be reminded that the above reserved position is to ensure that the power can be connected at any time. If you are interested in our products, you can call us.

阅读/ Recommended reading

  如果您遇到了卷帘门锁住的情况,这里有一些可能的解锁方法:  If you encounter a situation where the rolling shutter doo...

济南卷帘门:断掉一片后的处理方法,你学会了吗? 2024-11-19
如何延长卷闸门的寿命 2024-11-06
重视卷帘门门口堆物问题 2024-11-06
快速卷帘门介绍与快速卷帘门材料说明 2024-10-26
济南卷帘门厂:卷帘门安装施工工艺详解 2024-10-14
济南卷帘门安装秘籍,让家居更有面子 2024-09-21
济南遥控卷帘门:我来教你——卷闸门遥控器遇到故障怎么办? 2024-08-28
济南卷帘门:卷帘门(不锈钢款) 2024-07-25