济南富强门业有限公司
联系人:林经理
电话:151 6888 2846
邮箱:527800164@qq.com
地址:济南市历下区化纤厂路8号3号楼101号
济南卷帘门厂:卷帘门安装施工工艺详解
电动卷帘门安装方法和步骤:
Installation method and steps for electric rolling shutter door:
1、先在需要安装的门框框口位置画出线。表明尺寸大小,然后找工作人员设计出合适的电动卷帘门,这里值得注意的一点是框内高度比门扇的高度要高一点点。
1. First, draw a line at the position of the door frame opening that needs to be installed. Please indicate the size and ask the staff to design a suitable electric rolling shutter door. It is worth noting that the height inside the frame is slightly higher than the height of the door leaf.
2、先把电动卷帘门的门框固定,这里要先拆掉门框下部的固定板。(注意:洞口两侧地面要预留凹槽,经校正合格后,固定木楔,门框铁脚与预埋铁板件焊牢。用水泥砂浆或强度不低于10MPa细石混凝土嵌塞牢固即可。)
2. First, fix the door frame of the electric rolling shutter door. Here, you need to remove the fixing plate at the bottom of the door frame. (Note: grooves should be reserved on both sides of the entrance, and after being calibrated and qualified, wooden wedges should be fixed. The door frame iron feet should be welded firmly to the embedded iron plate parts. Cement mortar or fine stone concrete with a strength of not less than 10MPa can be used to embed them firmly.)
3、安装电动卷帘门扇主体门扇。一定要保证电动卷帘门与墙体结成整体,封闭性要做好,再粉刷洞口及墙体。粉刷完毕后,门缝应均匀平整,开启电动卷帘门应该自由轻便,不得有过紧、过松和反弹现象。
3. Install the main body of the electric rolling shutter door leaf. It is necessary to ensure that the electric rolling shutter door is integrated with the wall, with good sealing, and then paint the opening and wall. After painting, the door gap should be even and smooth, and the electric rolling shutter door should be free and easy to open, without being too tight, too loose, or bouncing.
防火卷帘门安装方法和步骤:
Installation method and steps for fireproof rolling shutter door:
1、按设计型号,查阅产品说明书和电气原理图。检查产品表面处理和零附件。量测产品各部位基本尺寸。检查门洞口是否与卷帘门尺寸相符;导轨、支架的预埋件位置、数量是否正确。
1. Refer to the product manual and electrical schematic diagram according to the design model. Check the surface treatment and accessories of the product. Measure the basic dimensions of each part of the product. Check if the door opening matches the size of the rolling shutter door; Are the positions and quantities of pre embedded parts for guide rails and brackets correct.
2、测量洞口标高,弹出两导轨垂线及卷筒中心线。
2. Measure the elevation of the opening and mark the vertical lines of the two guide rails and the centerline of the drum.
3、将垫板电焊在预埋铁板上,用螺丝固定卷筒的左右支架,安装卷筒。卷筒安装后应转动灵活。
3. Weld the pad onto the pre embedded iron plate, fix the left and right brackets of the drum with screws, and install the drum. The drum should rotate flexibly after installation.
4、安装减速器和传动系统。
4. Install the reducer and transmission system.
5、安裳电气拴街系统。
5. Anshang Electric Street Tying System.
6、空载试车。
6. Empty load test drive.
7、将事先装配好的帘板安装在卷筒上。
7. Install the pre assembled curtain onto the drum.
8、安装导轨。按图纸规定位置,将两侧及上方导轨焊牢于墙体预埋件上,并焊成以体,各导轨应在同一垂直平面上。
8. Install the guide rail. Weld the two sides and upper guide rails firmly onto the embedded parts of the wall according to the specified position on the drawing, and weld them into a body. Each guide rail should be on the same vertical plane.
9、安装水幕喷淋系统,并与总控制系统连接。
9. Install a water curtain sprinkler system and connect it to the main control system.
10、试车。先用手去试运行,再用电动机启闭数次,调整无卡住、阻滞及异常。
10. Test drive. First, try running it by hand, then use the electric motor to open and close several times, adjusting until there is no jamming, blockage, or abnormality.
自动门水晶卷帘门安装方法和步骤
Installation method and steps for automatic door crystal roller shutter door
1、看手动链条是否向下,在将电机固定在主板上,在把链条固定在轮盘和电机底座齿轮连接(一定上紧)在将遥控接线盒与电机连接,试下手柄是否颠倒,如颠倒遥控接收盒侧方有黑色按键,向另一方拨动助即可。
1. Firstly, check if the manual chain is down. Fix the motor on the motherboard, connect the chain to the wheel and motor base gear (make sure to tighten it), and connect the remote control junction box to the motor. Try to reverse the handle. If the remote control receiver box is reversed, there is a black button on the side, and turn it to the other side to assist.
2、用尺子量主板和副板的外边看下尺寸是否正确,如正确把轴上在侧板上,注意要先把轴打一条水平线,再用10个钻头打孔50公分,1个一定要直,再用14的镙母焊在轴上,记住要与轴上的孔垂直在焊,一定要焊牢固,再把帘子的片的中心与轴上的孔对齐用10个的钻头打孔一定要垂直(也可以用快丝固定)。
2. Measure the outer edges of the main and auxiliary boards with a ruler to see if the dimensions are correct. If the axis is correctly placed on the side board, make sure to first draw a horizontal line on the axis, then use 10 drill bits to drill a hole of 50cm, one of which must be straight, and then weld it to the axis with a 14 screw nut. Remember to weld it perpendicular to the hole on the axis, and make sure to weld it firmly. Then align the center of the first piece of the curtain with the hole on the axis and drill it vertically with 10 drill bits (or fix it with a quick wire).
3、在将卷帘门帘片穿好两侧用封头封好用拉铆钉拉住(记住开始封各一片封一个)。
3. After threading the rolling shutter door curtain, seal both sides with sealing heads and pull them with rivets (remember to start sealing one piece each).
4、封完后用绳翻过轴把帘子打个孔一头一个用绳拴住,别一端用人拽住,按下手柄的上升键,使轴运行将帘子带上去,镙丝杆把帘子和轴连在一起(水平要拧紧加垫)再把帘子升上去,一定要牢固。
4. After sealing, use a rope to flip over the shaft and make a hole in the curtain. Tie one end with a rope, and hold the other end with a person. Press the up button on the handle to make the shaft run and bring the curtain up. Connect the curtain and shaft together with a screw rod (tighten and pad horizontally), and then lift the curtain up firmly.
5、把轨道的一端开成人字口。
5. Open one end of the track into a human mouth.
6、把卷帘门帘子调平,上下线定位,左边滑轮是上限位,右边是下限位,(根据现场需要自行调节)。
6. Level the curtain of the rolling shutter door, position the upper and lower lines, with the left pulley at the upper limit and the right pulley at the lower limit (adjust according to on-site needs).
本文由 济南卷帘门厂 友情奉献.更多有关的知识请点击 http://www.jnhsjlm.com/ 真诚的态度.为您提供为的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is a friendly contribution from Jinan Rolling Shutter Door Factory. For more related knowledge, please click http://www.jnhsjlm.com/ Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned
阅读/ Recommended reading
- 济南卷帘门:断掉一片后的处理方法,你学会了吗? 2024-11-19
- 如何延长卷闸门的寿命 2024-11-06
- 重视卷帘门门口堆物问题 2024-11-06
- 快速卷帘门介绍与快速卷帘门材料说明 2024-10-26
- 济南卷帘门厂:卷帘门安装施工工艺详解 2024-10-14
- 济南卷帘门安装秘籍,让家居更有面子 2024-09-21
- 济南遥控卷帘门:我来教你——卷闸门遥控器遇到故障怎么办? 2024-08-28
- 济南卷帘门:卷帘门(不锈钢款) 2024-07-25
如果您遇到了卷帘门锁住的情况,这里有一些可能的解锁方法: If you encounter a situation where the rolling shutter doo...