联系我们
济南富强门业有限公司
联系人:林经理
电话:151 6888 2846
邮箱:527800164@qq.com
地址:济南市历下区化纤厂路8号3号楼101号
3种不同类型卷帘门的安装步骤
来源:http://www.jnzxmy.com 日期:2023-04-11 发布人:
卷帘门,是以多关节活动的门片一片片并联拼接而成的,现在许多的大型或者门面都安装此种门,因为不仅收缩方便,而且节省空间,当然系数也高。可卷帘门如何安装呢?下面就3种不同类型的济南卷帘门安装步骤介绍给大家。
Rolling shutter doors are made by connecting multi joint movable door pieces in parallel. Nowadays, many large shopping malls or storefronts install this type of door because it is not only convenient to shrink, but also saves space, and of course, has a high safety factor. How to install a roller shutter door? Below are the installation steps for three different types of Jinan roller shutter doors.
1、电动卷帘门安装方法:
1. Installation method of electric roller shutter door:
先,在需要安装的门框框口位置画线,表明尺寸的大小。注意:框内高度比门扇的高度要高一点点。
Firstly, draw a line at the position of the door frame opening that needs to be installed to indicate the size. Note: The height inside the frame is slightly higher than the height of the door leaf.
把电动卷帘门的门框固定,但是洞口两侧地面要记得预留凹槽。
Fix the door frame of the electric roller shutter door, but remember to reserve grooves on the ground on both sides of the opening.
然后,安装电动卷帘门扇主体门扇。安装时,一定要保证电动卷帘门与墙体结成整体,而且封闭性要做好,再将洞口及墙体粉刷,确保美观度。粉刷完后,应对门试试开启关闭是否顺畅自如。
Then, install the main body of the electric roller shutter door leaf. When installing, it is necessary to ensure that the electric roller shutter door is integrated with the wall, and the sealing must be done well. Then, the opening and wall should be painted to ensure aesthetics. After painting, try opening and closing the door smoothly and smoothly.
2、防火卷帘门安装方法:
2. Installation method of fireproof rolling shutter door:
a、按门的型号,量测产品各部位基本尺寸,检查门的洞口是否与卷帘门尺寸相符,导轨和支架的预埋位置、数量是否正确。然后,测量洞口标高,弹出两导轨垂线及卷筒线。
a. Measure the basic dimensions of each part of the product according to the door model, check whether the door opening matches the size of the rolling shutter door, and whether the embedded positions and quantities of the guide rail and bracket are correct. Then, measure the elevation of the opening and snap out the vertical lines of the two guide rails and the centerline of the drum.
b、将垫板电焊在预埋铁板上,用螺丝固定卷筒支架,安装卷筒。卷筒的安装应转动灵活。
b. Weld the base plate onto the embedded iron plate, fix the drum bracket with screws, and install the drum. The installation of the drum should rotate flexibly.
c、安装减速器、传动系统、裳电气拴街系统。
c. Install reducers, transmission systems, and electrical street systems.
d、将事先装配好的帘板安装在卷筒上。紧接着安装导轨,按照图纸规定的位置,将两侧及上方导轨焊牢于墙体预埋件上,并焊成以体,各导轨应在同一垂直平面上。
d. Install the pre assembled curtain panel on the drum. Next, install the guide rails. According to the positions specified in the drawings, weld the two sides and upper guide rails firmly onto the wall embedded parts and weld them into a body. Each guide rail should be in the same vertical plane.
e、后,安装水幕喷淋系统,并与总控制系统连接。装好后进行试运行,用电动机对门启闭数次,调整无卡住、阻滞及异常的状态即可。
e. Afterwards, install a water curtain sprinkler system and connect it to the main control system. After installation, conduct a trial run and use an electric motor to open and close the door several times, adjusting it to a state without jamming, blockage, or abnormalities.
3、自动门水晶卷帘门安装方法
3. Installation method for automatic door crystal roller shutter door
将电机固定在主板上,把链条固定在轮盘和电机底座齿轮连接,试下手柄是否颠倒,如果颠倒,遥控接收盒侧方有黑色按键,向另一方拨动助即可。
Fix the motor on the motherboard, connect the chain to the wheel disc and motor base gear, and test whether the handle is reversed. If it is reversed, there is a black button on the side of the remote control receiver box. Move the help to the other side.
用尺子量主板和副板的外边看下尺寸是否正确,如果正确把轴上在侧板上,注意要打成一条水平线;再用10个钻头打孔50公分,每一个都要直;然后,用14的镙母焊在轴上,记住一定要焊牢固;再把帘子的片的与轴上的孔对齐,并用快丝固定就可。
Measure the outer edges of the main board and auxiliary board with a ruler to see if the dimensions are correct. If the shaft is correctly placed on the side board, be sure to make a horizontal line; Drill 50 centimeters with 10 drill bits, each one straight; Then, weld the 14 nuts onto the shaft, remember to weld them firmly; Align the center of the first piece of the curtain with the hole on the shaft and fix it with fast wire.
将卷帘门的帘片穿好,两侧用封头封好。封完后,用绳翻过轴把帘子打孔用绳拴住,再把帘子升上去,切忌一定要牢固。
Thread the curtains of the rolling shutter door and seal both sides with covers. After sealing, use a rope to turn over the shaft to drill holes in the curtain and tie it with a rope. Then, lift the curtain up, making sure it is secure.
把轨道的一端开成人字口,卷帘门帘子调平即可。
Open one end of the track into a zigzag opening and level the curtain of the rolling shutter door.
以上就是对三种不同类型卷帘门安装方法的全部介绍,相信通过对小编整理内容的认知,应该知道如何安装卷帘门了吧。如果自己还是不行的,那建议大家请的师傅来进行安装吧。可以随时联系我们http://www.jnzxmy.com!
The above is a complete introduction to the installation methods of three different types of rolling shutter doors. I believe that through understanding the content organized by the editor, you should know how to install rolling shutter doors. If you are still unable, it is recommended that you hire a professional technician to install it. Feel free to contact us at any time http://www.jnzxmy.com !
下一篇:卷帘门的各类部件如何维护 上一篇:卷帘门易磨损部件正确的维护方法
阅读/ Recommended reading
- 电动卷帘门的优势 2024-11-12
- 济南卷帘门:卷帘门遥控器失灵怎么办? 2024-09-02
- 济南卷帘门厂:卷帘门卡主了怎么办 2024-08-28
- 济南电动卷帘门:电动卷闸门没电了怎么开? 2024-08-28
- 济南卷帘门:控制器的安装技巧 2024-07-06
- 车库门出现故障怎么办? 2024-06-12
- 防火卷帘门分几种类别? 2024-06-06
- 防火卷帘门对于企业的使用有哪些? 2024-06-09
济南卷帘门:卷帘门遥控器失灵时试试本文的方法吧!
2024-11-16
检查电池 : Check the battery: 检查遥控器电池是否还有电。如果电池电量不足,更换一节新的电池即可。在更换电池时,注意电池的正负极方向,确保放入的电池...